Friday, April 24, 2009

Highlights from 04-18-2009 Bi-Weekly Staff Meeting

Here are the highlights from our staff meeting held on April 18th:

  • Dr. Weatherwax is working with CPO Sachertorte from Engineering to create new equipment and rezzable rooms. As always, prim counts are at a premium and even more so with scripted items, so Dr. Weatherwax and Dr. Juran will work with Engineering to set prim parameter guidelines and utilize sculpties when possible.
  • Dr. Weatherwax reported that he is developing an "interactino standard" for the devices used in Medical. For instance, as of now, the tricorders do not give the same information on the patient as the biobed biosigns; or, you may inject a crewman with your hypospray but the results do not show up in the fleet weapons HUD. An interactino standard can make the different devices interact in a meaningful way to inworld rp's. This would open up many more rp options beginning with Medical, but eventually spreading throughout GFC. This will take a great deal of time (not to mention know-how and dedication), but Dr. Weatherwax does believe it is possible to "Make It So!"
  • Dr. Bourne reported on progress from Engineering with the MERSI rp collapsing building set. He is also exploring opportunities to rp with other GFC divisions.
Next meeting: Saturday, May 2nd, at 4:30pm SLT, at the McCoy-Troi Medical Center. We look forward to seeing you there!!
Michiko Akina
LT(jg)/ACMO

3 comments:

Dave_B said...

I really must take care to type better than I usually do in the meetings that might be logged and blogged - Faithful transcription by our dedicated bloggers preserve ALL my typos :) like when my fingers get ahead of my brain and reverse the last two letters of "interaction"

Michiko Akina said...

No apologies necessary. The author was trying to convey the gist of a very technical discussion and didn't even consider what might be a typo!

Journey Juran said...

We are Starfleet medics... being "multilingual" is part of the training :)